The Grand Coulee Dam, the largest hydroelectric dam in the United States, has been delivering water and power to the western states since its construction was completed in 1941. Located on the Columbia River in Washington, this critical facility relies heavily on its fire suppression system to ensure safety and uninterrupted operations.
For over 30 years, a 6-inch OCV Model 127-3 pressure reducing valve played a crucial role in the fire suppression system at the dam’s Left Powerhouse. Until the 1980s, the valve had been reliably safeguarding the transformers. But, after three decades of service, officials at the Bureau of Reclamation decided it was time for a replacement. Instead of overhauling the dam’s aging plumbing system, they opted to replace the valve with an identical model from OCV Control Valves, to maintain consistency and performance.
Safety regulations prohibit the running of generating units without fire protection on the transformers. So, hydropower production had to be halted during the valve replacement process. Ensuring swift, efficient installation was critical to minimize shutdown time while maintaining safety for the dam and its surrounding areas.
To expedite the replacement process, our team pre-set and tested the new valve to the required pressure before shipping it to the customer, ensuring that it would be ready for immediate installation. The Bureau of Reclamation team replaced the valve in less than one day, with just two hydro mechanics completing the task.
We also provided a duplicate valve as a precautionary measure to ensure continued safety and reliability. Both valves were delivered in three to four weeks, meeting the tight project timeline.
The new OCV pressure reducing valve was installed with minimal downtime, leaving the Left Powerhouse without power for only a short period.
Aquestia’s commitment to customer service and precision engineering will ensure that the Grand Coulee Dam will be able to maintain its critical role in providing water and power to the region for years to come.
The Grand Coulee Dam, the largest hydroelectric dam in the United States, has been delivering water and power to the western states since its construction was completed in 1941. Located on the Columbia River in Washington, this critical facility relies heavily on its fire suppression system to ensure safety and uninterrupted operations.
For over 30 years, a 6-inch OCV Model 127-3 pressure reducing valve played a crucial role in the fire suppression system at the dam’s Left Powerhouse. Until the 1980s, the valve had been reliably safeguarding the transformers. But, after three decades of service, officials at the Bureau of Reclamation decided it was time for a replacement. Instead of overhauling the dam’s aging plumbing system, they opted to replace the valve with an identical model from OCV Control Valves, to maintain consistency and performance.
Challenge
Minimizing downtime during valve replacement
Safety regulations prohibit the running of generating units without fire protection on the transformers. So, hydropower production had to be halted during the valve replacement process. Ensuring swift, efficient installation was critical to minimize shutdown time while maintaining safety for the dam and its surrounding areas.
Solution
Pre-set pressure reducing valve for quick installation
To expedite the replacement process, our team pre-set and tested the new valve to the required pressure before shipping it to the customer, ensuring that it would be ready for immediate installation. The Bureau of Reclamation team replaced the valve in less than one day, with just two hydro mechanics completing the task.
We also provided a duplicate valve as a precautionary measure to ensure continued safety and reliability. Both valves were delivered in three to four weeks, meeting the tight project timeline.
OCV-Grand-Coulee-Dam-Left-Powerhouse-4
Results
Safety and reliability maintained with minimal disruption
The new OCV pressure reducing valve was installed with minimal downtime, leaving the Left Powerhouse without power for only a short period.
Aquestia’s commitment to customer service and precision engineering will ensure that the Grand Coulee Dam will be able to maintain its critical role in providing water and power to the region for years to come.
The entire project was a success
The entire project was a success. Being able to receive an identical valve to the original enables us to keep the dam generating power, without additional upgrades.
Ty Murray
Hydro mechanics, Bureau of Reclamation
Related Case Studies
Turning hydraulic complexity into reliable flow – safeguarding irrigation in water-scarce conditions
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.