The North Bypass Road of Shanghai is the largest underground urban road project in China, spanning approximately 19.1 km. With a single tube and two layers accommodating six bidirectional lanes, the tunnel officially opened to traffic in October 2024. This massive infrastructure project required cutting-edge fire protection solutions capable of meeting strict space constraints, while ensuring maximum reliability and safety.
)
[1] => Array
(
[acf_fc_layout] => image
[image] => Array
(
[ID] => 23428
[id] => 23428
[title] => Master Layout Plan of the North Bypass Road.
[filename] => CaseStudy.FP_.OCV_.Tunnel.EN4_.png
[filesize] => 1939577
[url] => https://www.aquestia.com/wp-content/uploads/2025/08/CaseStudy.FP_.OCV_.Tunnel.EN4_.png
[link] => https://www.aquestia.com/case_studies/thinking-big-to-create-a-small-footprint-how-aquestia-customized-a-valve-to-limited-dimensions/casestudy-fp-ocv-tunnel-en4/
[alt] => Master Layout Plan of the North Bypass Road.
[author] => 3
[description] => Master Layout Plan of the North Bypass Road.
[caption] => Master Layout Plan of the North Bypass Road.
[name] => casestudy-fp-ocv-tunnel-en4
[status] => inherit
[uploaded_to] => 23389
[date] => 2025-08-10 12:29:23
[modified] => 2026-05-20 07:53:01
[menu_order] => 0
[mime_type] => image/png
[type] => image
[subtype] => png
[icon] => https://www.aquestia.com/wp-includes/images/media/default.png
[width] => 1720
[height] => 768
[sizes] => Array
(
[thumbnail] => https://www.aquestia.com/wp-content/uploads/2025/08/CaseStudy.FP_.OCV_.Tunnel.EN4_.png
[thumbnail-width] => 128
[thumbnail-height] => 57
[medium] => https://www.aquestia.com/wp-content/uploads/2025/08/CaseStudy.FP_.OCV_.Tunnel.EN4_.png
[medium-width] => 1720
[medium-height] => 768
[medium_large] => https://www.aquestia.com/wp-content/uploads/2025/08/CaseStudy.FP_.OCV_.Tunnel.EN4_-768x343.png
[medium_large-width] => 768
[medium_large-height] => 343
[large] => https://www.aquestia.com/wp-content/uploads/2025/08/CaseStudy.FP_.OCV_.Tunnel.EN4_.png
[large-width] => 1720
[large-height] => 768
[1536x1536] => https://www.aquestia.com/wp-content/uploads/2025/08/CaseStudy.FP_.OCV_.Tunnel.EN4_-1536x686.png
[1536x1536-width] => 1536
[1536x1536-height] => 686
[2048x2048] => https://www.aquestia.com/wp-content/uploads/2025/08/CaseStudy.FP_.OCV_.Tunnel.EN4_.png
[2048x2048-width] => 1720
[2048x2048-height] => 768
)
)
[caption] => Master Layout Plan of the North Bypass Road.
)
)
)
[1] => Array
(
[title] => Challenge
[subtitle] => A tight fit
[content_parts] => Array
(
[0] => Array
(
[acf_fc_layout] => free_text
[free_text] =>
The fire protection system of the eastern length of the tunnel required 730 deluge valve sets to be installed across a section 8.2 km long. However, the limited dimensions of the deluge valve cabinet – especially their strict requirements for a limited footprint – posed a major challenge. Standard hydraulic control valve widths and trim dimensions could not fit the confined spaces within the tunnel walls. The solution needed to be both highly reliable and compact, without compromising on the performance standards required for fire protection in such a critical infrastructure.
Through its OCV deluge valve series, Aquestia designed a customized narrow-body valve and alarm trim configuration specifically for this project. Adjustments were made to the standard trim configuration to meet the tight skid dimensions. In total, 730 units of 4” size model OCV DE\EL (CN) deluge valves were installed, each fully integrated with other fire protection components, into cabinets that were embedded directly into the tunnel wall. Aquestia’s engineering team provided on-site technical support during installation and commissioning, ensuring a smooth and efficient setup.
Aquestia’s technical expertise and customized design ensured that all fire protection requirements were met without compromise. Now operational, the system has proven to be both reliable and efficient, with seamless integration into the tunnel’s fire safety network.
The North Bypass Road of Shanghai is the largest underground urban road project in China, spanning approximately 19.1 km. With a single tube and two layers accommodating six bidirectional lanes, the tunnel officially opened to traffic in October 2024. This massive infrastructure project required cutting-edge fire protection solutions capable of meeting strict space constraints, while ensuring maximum reliability and safety.
Master Layout Plan of the North Bypass Road.
Challenge
A tight fit
The fire protection system of the eastern length of the tunnel required 730 deluge valve sets to be installed across a section 8.2 km long. However, the limited dimensions of the deluge valve cabinet – especially their strict requirements for a limited footprint – posed a major challenge. Standard hydraulic control valve widths and trim dimensions could not fit the confined spaces within the tunnel walls. The solution needed to be both highly reliable and compact, without compromising on the performance standards required for fire protection in such a critical infrastructure.
Shanghai Tunnel.
Solution
Made to measure
Through its OCV deluge valve series, Aquestia designed a customized narrow-body valve and alarm trim configuration specifically for this project. Adjustments were made to the standard trim configuration to meet the tight skid dimensions. In total, 730 units of 4” size model OCV DE\EL (CN) deluge valves were installed, each fully integrated with other fire protection components, into cabinets that were embedded directly into the tunnel wall. Aquestia’s engineering team provided on-site technical support during installation and commissioning, ensuring a smooth and efficient setup.
Valve adaptation to limited dimensions of the cabinet.
Results
Aquestia’s technical expertise and customized design ensured that all fire protection requirements were met without compromise. Now operational, the system has proven to be both reliable and efficient, with seamless integration into the tunnel’s fire safety network.
730 units of 4” size model OCV DE\EL (CN) deluge valves were installed.
Customer perspective
Aquestia's technical team showed great professionalism and responsibility
During the installation and commissioning process, Aquestia’s technical personnel demonstrated a high level of professionalism and responsibility. The products have performed reliably during use, and after-sales service has been exemplary.
Shanghai Tunnel Engineering Co., Ltd
Related Case Studies
Pressure reducing valve helps protect the largest hydroelectric dam in USA
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.